6 Commissioning
Maschinenfabrik Reinhausen GmbH 2020
164
4349322/01 EN
VACUTAP
®
VV
®
2. Remove screw cap on air-vent valve E1 on the on-load tap-changer head
cover.
Figure 170: Air-vent valve E1
3. Use screwdriver to lift valve tappet on air-vent valve E1 and bleed on-load
tap-changer head.
Figure 171: Valve tappet
4. Seal air-vent valve E1 with screw cap (tightening torque 10 Nm).
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......