5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
54
4349322/01 EN
VACUTAP
®
VV
®
► Place on-load tap-changer head cover on on-load tap-changer head and
secure.
Figure 36: On-load tap-changer head cover
5.2.6 Drying on-load tap-changer in transformer tank
Dry on-load tap-changer in accordance with the following instructions to en-
sure the dielectric values assured by MR on the on-load tap-changer.
If you want to dry the on-load tap-changer in the transformer tank, fully as-
semble the transformer first and then undertake drying.
If drying in the transformer tank, the following methods are possible:
▪ Vacuum-drying
▪ Vapor-phase drying
As an alternative to drying the on-load tap-changer in the transformer tank, it
can also be dried in an autoclave.
5.2.6.1 Vacuum-drying in the transformer tank
The on-load tap-changer head cover remains closed during the entire drying
process.
1. Establish a connecting lead between either connections E2 and Q or con-
nections E2 and R on the on-load tap-changer head.
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......