5 Mounting
Maschinenfabrik Reinhausen GmbH 2020
53
4349322/01 EN
VACUTAP
®
VV
®
1. Supply kerosene vapor at a temperature of around 90°C. Keep this tem-
perature constant for 3 to 4 hours.
2. Increase the kerosene vapor temperature by approx. 10°C/hour to the de-
sired final temperature of max. 125°C at the on-load tap-changer.
3. Vacuum-dry on-load tap-changer at between 105°C and maximum 125°C
for at least 50 hours.
4. Residual pressure of no more than 10
-3
bar.
5.2.5.2.5 Closing kerosene drain plug
►
NOTICE!
An open kerosene drain plug leads to insulating fluid escaping
from the oil compartment and therefore to damage to the on-load tap-
changer. Close kerosene drain plug (tightening torque 39 Nm).
5.2.5.2.6 Securing on-load tap-changer head cover
NOTICE
Damage to the on-load tap-changer!
A missing or damaged o-ring as well as unclean sealing surfaces lead to in-
sulating fluid escaping and therefore to damage to the on-load tap-changer.
► Ensure that the o-ring is positioned untwisted in the on-load tap-changer
head cover.
► Ensure that the o-ring does not become damaged when mounting the
cover.
► Ensure that the sealing surfaces on the on-load tap-changer head cover
and on-load tap-changer head are clean.
Содержание VACUTAP VV
Страница 1: ...On load tap changer VACUTAP VV Installation and commissioning instructions 4349322 01 EN ...
Страница 112: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 112 4349322 01 EN VACUTAP VV Figure 109 Mounting protective tube ...
Страница 125: ...5 Mounting Maschinenfabrik Reinhausen GmbH 2020 125 4349322 01 EN VACUTAP VV Figure 125 Angle of deflection α ...
Страница 182: ...9 Drawings Maschinenfabrik Reinhausen GmbH 2020 182 4349322 01 EN VACUTAP VV 9 Drawings ...
Страница 188: ......
Страница 195: ......
Страница 197: ......