SAN32M-2 Installation and Service Manual
18
Table 3
Installation task summary
Task number and description
Required or optional
Page
Task 1: Verify installation requirements
Required.
19
Task 2: Unpack, inspect, and install the Ethernet hub
(optional)
Perform task if hub is required to connect switch and
management interface.
20
Task 3: Unpack, inspect, and install the product
Required.
23
Task 4: Configure product at the EFCM Basic Edition
interface (optional)
Perform task if switch is managed through the EFCM
Basic Edition interface.
26
Task 5: Configure product network information (optional)
Configure if connecting multiple switches or connecting
switch and management server to a public LAN.
45
Task 6: Configure server password and network addresses
Required if management server is used.
48
Task 7: Configure management server information
Required if management server is used.
51
Task 8: Configure Windows operating system users
Required if management server is used.
54
Task 9: Set management server date and time
Required if management server is used.
57
Task 10: Configure the call-home feature (optional)
Configure if specified by customer and telephone
connection is provided.
59
Task 11: Assign user names and passwords
Required if management server is used.
60
Task 12: Configure the product to the management
application
Required if management server is used.
62
Task 13: Record or verify server restore information
Required if management server is used.
63
Task 14: Verify product-to-server communication
Required if management server is used.
64
Task 15: Configure PFE key (optional)
Configure if product feature enablement (PFE) key is
ordered.
66
Task 16: Configure management server (optional)
Configure for open-systems host control of switch.
67
Task 17: Set product date and time
Required if management server is used.
70
Task 18: Configure the Element Manager application
Required if management server is used.
72
Task 19: Back up configuration data
Required if management server is used.
87
Task 20: Cable Fibre Channel ports
Required.
90
Task 21: Configure zoning (optional)
Perform task to configure zoning.
91
Task 22: Connect product to a fabric element (eptional)
Perform task to connect switch to a Fibre channel fabric.
91
Содержание SAN32M-2
Страница 2: ......
Страница 10: ...SAN32M 2 Installation and Service Manual xii...
Страница 14: ...SAN32M 2 Installation and Service Manual xvi...
Страница 42: ...SAN32M 2 Installation and Service Manual 16...
Страница 120: ...SAN32M 2 Installation and Service Manual 94...
Страница 174: ...SAN32M 2 Installation and Service Manual 148...
Страница 236: ...SAN32M 2 Installation and Service Manual 210...
Страница 240: ...SAN32M 2 Installation and Service Manual 214...
Страница 244: ...SAN32M 2 Installation and Service Manual 218...
Страница 290: ...SAN32M 2 Installation and Service Manual 264...
Страница 308: ...SAN32M 2 Installation and Service Manual 282...
Страница 311: ......
Страница 312: ...Printed in USA GC26 7763 01...