Installation and Operation
HYDAC Filtersysteme GmbH
en
Page 22
BeWa CS1000 3247149l en.doc
2006-07-24
7.3.1 Selection Guidelines for a Measurement Point
1
The measurement point has to be selected so that the measured volume is taken from a
turbulent flow area, i.e. a pipe bend.
2
The CS has to be installed in the vicinity of the measurement point in order to obtain
precision-timed results.
3
While installing the measurement line, make sure that no "siphon trap" is created so as to
prevent sedimentation buildup (formation of particle deposits in the line).
A
B
2
A
B
1
3
A
2
1
B
WRONG WRONG
OK
Содержание CS1000 Series
Страница 97: ...Notizen Note Note ...
Страница 98: ...Notizen Note Note ...
Страница 99: ...Notizen Note Note ...