11.2.3.3 Flushing in liquid preparations
during the
filling process
1. Enter the desired container content in the
terminal
2. Connect the suction hose to the
filling con
-
nection.
Filling connection
3.
Start filling via terminal.
4. Switch on the induction hopper.
5. Switch on the injector.
6. Open the lid on the induction hopper.
7.
Fill the required preparation quantity as cal-
culated for filling the tank into the
induction
hopper (max. 45l).
8.
Open the switch-over ball valve (e) and have
the content completely sucked out of the
induction hopper.
9. Close the switch-over ball valve again. If
necessary repeat this process, if more than
45 l of preparation is needed.
10.Preliminarily clean the induction hopper with
the
closed circuit flushing (c).
11.Open the switch-over ball valve and have the
contents sucked off.
12.Close the switch-over ball valve again.
13.
Switch off the induction hopper.
14.Top up the missing amount of water.
15.Adjust the desired agitator power.
a
b
c
d
e
CLOSE
UP
ECOFILL - OPEN
At the beginning of the filling process the water
sucked in through the suction hose is applied to
the induction hopper.
Once the desired tank contents is reached, the
suction valve will automatically switch over to
the solution tank. Chemical is then applied to
the induction hopper.
In order to clean the induction hopper switch
the suction valve over to the fresh water tank.
Use the washing gun to remove any residues
from the induction hopper. Pull lever (b) and
operate the gun to do so.
Make sure that no undesired pint-type entries
of preparation are generated!
139
Содержание LEEB PT 330
Страница 4: ......
Страница 6: ......
Страница 33: ...1 17 Position of safety stickers 33...
Страница 34: ...34...
Страница 173: ...NOTE Lubricate the lubrication points on the folding boom every 50 operating hours or once every week 173...
Страница 187: ...Diagram a with example 187...
Страница 201: ...201...
Страница 202: ......