E3 Series Installation/Operation Manual
—
P/N 9000-0574:I 11/04/10
89
Cabinets
Installation
2.5.10.6 Cabinet D, E3-INCC-D Sub-Assembly Plate to the Backbox
Installation
Mount the Cabinet D, E3-INCC-D sub-assembly plate on the studs in the backbox and secure with
eight (8), #10-32 nuts as shown in Locations 1 thru 8 of the figure below.
Figure 2.5.10.6.1 Cabinet D, E3-INCC-D Sub-Assembly Plate to the Backbox
Installation
CABINET D,
BACKBOX
CABINET D,
E3-INCC-D PLATE
(See Note 1)
BA
TTE
RIE
S
NUT, HEX
#10-32
8 PLACES
DA
CT
-E3
RP
T-E
3
INI-
VG
SE
RIE
S
ILI-
E3,
ILI9
5-E
3 S
ER
IES
OR
AN
X
ILI-E
3, IL
I95
-E3
SE
RIE
S
OR
AN
X
1
2
3
4
5
6
1
2
3
4
5
6
7
8
8
7
NOTE 1: Install
either the E3-INX-D
or the E3-INCC-D plate
to the backbox.
ILI-E
3, IL
I95
-E3
SE
RIE
S
OR
AN
X
NOTE 2: If no batteries
are required, install the
FPT-GATE-3 Extender
Plate to the Cabinet D
backbox. (Optional)
Содержание Gamewell-FCI E3 Series
Страница 95: ...94 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Installation Cabinets Notes ...
Страница 172: ...E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 171 Analog Sensors E3 Series System Connections Notes ...
Страница 179: ...178 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Programming INFO Menu Selection Notes ...
Страница 185: ...184 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Notes ...
Страница 189: ...Gamewell FCI 12 Clintonville Road Northford CT 06472 1610 USA 203 484 7161 fax 203 484 7118 www gamewell fci com ...
Страница 190: ...CFI Security Inc 1845 Northwestern Suite B El Paso Texas 79912 Ph 915 778 6061 Fax 915 778 7046 ...