E3 Series Installation/Operation Manual
—
P/N 9000-0574:I 11/04/10
51
Cabinets
Installation
2.5.6.6 Cabinet B, Inner Door Installation
1.
Mount the LCD-E3 keypad on the inner door and secure with eight (8), #6-32 nuts in the eight-
hole mounting pattern as shown in Location 1 of the figure below.
2.
Mount the ASM-16 on the inner door and secure with four (4), #6-32 nuts in the four-hole
mounting pattern as shown in Location 2 of the figure below.
3.
Secure the opposite end of the bonding wire to the welded #6 stud on the inner side of the inner
door using the #6 nut as shown in Location 3 of the figure below.
4.
After the panel is wired, use the thumbscrews to secure the inner door to the backbox as shown
in Location 4 of the figure below.
Figure 2.5.6.6.1 Cabinet B, Inner Door Installation
LC D-E3
K E YP A D
A S M -16
C A B IN ET B ,
IN N E R D O O R
2
2
1
2
1
2
N U T, H EX
(#6-32)
12 P LA C ES
1
1
1
2
B O N D IN G
W IR E
3
3
THUM BSCREW S
TO SECURE THE
INNER DO O R TO
THE BACK BOX
4
4
Содержание Gamewell-FCI E3 Series
Страница 95: ...94 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Installation Cabinets Notes ...
Страница 172: ...E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 171 Analog Sensors E3 Series System Connections Notes ...
Страница 179: ...178 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Programming INFO Menu Selection Notes ...
Страница 185: ...184 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Notes ...
Страница 189: ...Gamewell FCI 12 Clintonville Road Northford CT 06472 1610 USA 203 484 7161 fax 203 484 7118 www gamewell fci com ...
Страница 190: ...CFI Security Inc 1845 Northwestern Suite B El Paso Texas 79912 Ph 915 778 6061 Fax 915 778 7046 ...