48
E3 Series Installation/Operation Manual
—
P/N 9000-0574:I 11/04/10
Installation
Cabinets
2.5.6.4 Cabinet B, Backbox Sub-Assembly Installation (Typical)
1.
Mount the ILI-MB-E3/ILI95-MB-E3 over the standoffs in the backbox and secure the eight,
(8), standoffs, (3/16
” hex, #4-40 x 1.0”) in
the eight-hole mounting pattern as shown in
Location 1 of Figure 2.5.6.4.2. (Note: PCB orientation).
2.
Mount the DACT-E3 and the RPT-E3 on top of the ILI-MB-E3/ILI95-MB-E3 and secure the
eight (8), screws (#4-40 x 3/8
”) into the eigh
t (8), standoffs as shown in Location 2 of
Figure 2.5.6.4.2. (Note: PCB orientation).
3.
Set the PM-9/PM-9G over the standoffs in the backbox and secure the six (6), screws (#4-40 x
3/8
”) in the six-hole mounting pattern as shown in Location 3 of Figure 2.5.6.4.2. (Note: PCB
orientation).
4.
Place the batteries in the backbox. The cabinet will accommodate two (2) batteries up to a
maximum of 18 amp/hours capacity.
Figure 2.5.6.4.1 Cabinet B, Backbox Sub-Assembly (Standard View)
NOTE: You can replace the DACT-E3/RPT-E3 with the ANX and mount the ANX on top of the ILI-
MB-E3/ILI95-MB-E3.
BATTERIES
ILI-MB-E3/ILI95-MB-E3
DACT-E3
RPT-E3
PM-9/PM-9G
PM-9/PM-9G PCB
Содержание Gamewell-FCI E3 Series
Страница 95: ...94 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Installation Cabinets Notes ...
Страница 172: ...E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 171 Analog Sensors E3 Series System Connections Notes ...
Страница 179: ...178 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Programming INFO Menu Selection Notes ...
Страница 185: ...184 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Notes ...
Страница 189: ...Gamewell FCI 12 Clintonville Road Northford CT 06472 1610 USA 203 484 7161 fax 203 484 7118 www gamewell fci com ...
Страница 190: ...CFI Security Inc 1845 Northwestern Suite B El Paso Texas 79912 Ph 915 778 6061 Fax 915 778 7046 ...