E3 Series Installation/Operation Manual
—
P/N 9000-0574:I 11/04/10
35
Cabinets
Installation
2.5.4 Cabinet A or AA, 2-Bay Installation Instructions
The E3 Series
®
, Cabinet A or Cabinet AA, 2-Bay assembly typically includes the following:
•
Backbox
– Cabinet A, Trim Rings (Optional Accessory)
•
Outer Door
•
Inner Door, 2-Bay:
– One (1), LCD-E3 unit
– One (1), ASM-16 unit
– One (1), Blank Plate Optional
•
Hardware Kit
Figure 2.5.4.1 Cabinet A or AA, 2-Bay Standard View
NOTE: Cabinet AA may be used with the 2-Bay and 3-Bay outer door. A microphone can be
installed as an optional accessory in the blank plate. For information on the Cabinet A or Cabinet
AA installation, refer Section 2.5.4 and Section 2.5.5.
Содержание Gamewell-FCI E3 Series
Страница 95: ...94 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Installation Cabinets Notes ...
Страница 172: ...E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 171 Analog Sensors E3 Series System Connections Notes ...
Страница 179: ...178 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Programming INFO Menu Selection Notes ...
Страница 185: ...184 E3 Series Installation Operation Manual P N 9000 0574 I 11 04 10 Notes ...
Страница 189: ...Gamewell FCI 12 Clintonville Road Northford CT 06472 1610 USA 203 484 7161 fax 203 484 7118 www gamewell fci com ...
Страница 190: ...CFI Security Inc 1845 Northwestern Suite B El Paso Texas 79912 Ph 915 778 6061 Fax 915 778 7046 ...