![Hitachi IJ RX2 Скачать руководство пользователя страница 34](http://html.mh-extra.com/html/hitachi/ij-rx2/ij-rx2_service-manual_143791034.webp)
2-17
2.3.6 Heating unit confirmation
●
The operation confirmation of heating unit is performed.
Heating unit power ON/OFF.
●
A display of an ambient temperature and a heating unit temperature is performed.
●
Perform this operation confirmation in a state other than "Ready" state.
1 Press Adjustment/operational checkout on the maintenance menu.
If Adjustment/operational checkout is not displayed on the maintenance menu, set the
service personnel maintenance mode on the login user selection screen.
The Adjustment/operational checkout screen is displayed.
For information on changing to the service personnel maintenance mode,
refer to “2.1 Setting of service personnel maintenance mode.”
Manual
Start
up
HOME
Back
Adjust./oper. checkout
Excitation
adjustment
Charge voltage
confirmation
Phase margin test
Heating unit
confirmation
Auto-phase gain
adjustment
Level sensor
confirmation
[Stop ]
2015.07.07 12:45
Com=0
Heating unit confirmation
Содержание IJ RX2
Страница 1: ...Service Manual HITACHI Printer Model RX2 Revision Feb 2014 Version A ...
Страница 13: ...1 8 2 External views Rear side 1 2 2 Main body internal ...
Страница 14: ...1 9 1 2 3 Print head ...
Страница 101: ...3 26 Circuit diagram of EZJ127A ...
Страница 102: ...3 27 Circuit diagram of EZJ127B ...
Страница 116: ...3 41 Circuit diagram of EZJ129 ...
Страница 164: ...4 40 5 Reset the time of the R air filter to 0 on the Parts usage time management screen ...
Страница 247: ...7 Attached Drawing 7 1 Circulation System Diagram Circulation System Diagram 7 1 ...
Страница 248: ...7 2 Electrical Connection Diagram 7 2 1 Electrical Connection Diagram RX2 S Standard model 7 2 ...
Страница 249: ...7 3 7 2 2 Electrical Connection Diagram RX2 B Basic model 7 3 ...
Страница 252: ... Nozzle diameter 65μm 7 6 7 4 Dimensions around charge electrode and deflection electrode 循環系統図 ...