8.
While carefully holding the snap-in latch in the open position, slide the energy pack holder up to disengage it from
the chassis.
9.
Install the energy pack into the holder:
a. Route the energy pack cable through the holder cutout marked with a down arrow.
b. Install the energy pack in the holder.
10. Secure the energy pack cable through the holder cable clips.
Hardware options installation
135
Содержание ProLiant ML350 Gen10
Страница 26: ...SFF drive bay numbering Smart Array controller Tower orientation Rack orientation 26 Component identification ...
Страница 27: ...SFF drive bay numbering SAS expander Tower orientation Rack orientation Component identification 27 ...
Страница 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Страница 31: ...Component identification 31 ...
Страница 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Страница 55: ...10 Secure the rear end of rack rails to the rack columns with the rear shipping screws Operations 55 ...
Страница 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...