2.
If only one power supply is going to be installed in the redundant power supply cage, make sure that the blank in the
power supply bay 2 is firmly secured.
3.
Install the power distribution board:
a. Align the notches on the board with the pins on the chassis.
b. Slide the board down to engage it fully with its connector.
c. Tighten the board thumbscrew.
4.
Install the energy pack holder:
Hardware options installation
151
Содержание ProLiant ML350 Gen10
Страница 26: ...SFF drive bay numbering Smart Array controller Tower orientation Rack orientation 26 Component identification ...
Страница 27: ...SFF drive bay numbering SAS expander Tower orientation Rack orientation Component identification 27 ...
Страница 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Страница 31: ...Component identification 31 ...
Страница 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Страница 55: ...10 Secure the rear end of rack rails to the rack columns with the rear shipping screws Operations 55 ...
Страница 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...