11. Slide the power supply into the bay until it clicks into place.
12. Make sure the -48 V DC power source is off or the PDU breaker is in the off position, and then connect the power
cord to the -48 V DC power source or PDU.
13. Turn on the -48 V power source or switch the PDU breaker to the on position to supply -48 V to the power supply.
14. Make sure that the power supply LED is green.
Tower-to-rack conversion kit
Use the tower-to-rack conversion kit to switch the tower server to rack mode operation. A rack-mounted server occupies
5U space in the rack and supports in-rack serviceability for all server components.
Kit contents
• Left and right rack rail assemblies
• Server tray
• Cable management arm
• Chassis rear bracket screws (3)
• Shipping hardware – Install these hardware only if you intend to transport or ship a rack-mounted server to a new
location.
82
Hardware options installation
Содержание ProLiant ML350 Gen10
Страница 26: ...SFF drive bay numbering Smart Array controller Tower orientation Rack orientation 26 Component identification ...
Страница 27: ...SFF drive bay numbering SAS expander Tower orientation Rack orientation Component identification 27 ...
Страница 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Страница 31: ...Component identification 31 ...
Страница 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Страница 55: ...10 Secure the rear end of rack rails to the rack columns with the rear shipping screws Operations 55 ...
Страница 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...