• Can be installed in boxes 1–3
• Can be installed together with the 8 SFF hot-plug drive cage option
• Supports SATA or SAS drives depending on the storage controller used
Kit contents
• 4 LFF hot-plug drive cage
• LFF drive blanks (4, preinstalled in the drive cage)
• Drive power cable
• T-15 Torx screws (4)
Installing the 4 LFF hot-plug drive cage
Prerequisites
Before you perform this procedure, make sure that you have the following items available:
• Drive cage option kit
•
Storage controller cable option
• LFF hot-plug drive option
• T-15 Torx screwdriver
Procedure
1.
2.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Do one of the following:
Position the tower server for hardware configuration.
• Server in rack mode:
Extend the server from the rack.
6.
7.
8.
If installed,
9.
Do one of the following:
If the drive cage is to be installed in box 1, remove the media bay blanks.
96
Hardware options installation
Содержание ProLiant ML350 Gen10
Страница 26: ...SFF drive bay numbering Smart Array controller Tower orientation Rack orientation 26 Component identification ...
Страница 27: ...SFF drive bay numbering SAS expander Tower orientation Rack orientation Component identification 27 ...
Страница 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Страница 31: ...Component identification 31 ...
Страница 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Страница 55: ...10 Secure the rear end of rack rails to the rack columns with the rear shipping screws Operations 55 ...
Страница 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...