8.
If you are installing the server in a square-hole rack, install the cage nuts. When installed, the flanges on the cage nut
should face the outside of the rack:
a. Hook the bottom flange of the cage nut in the rack hole.
b. Insert the tip of the insertion tool through the hole and hook the top flange of the cage nut.
c. Use the insertion tool to pull the cage nut through the hole until the top flange snaps into position.
9.
Secure the front end of rack rails to the rack columns with the shipping brackets.
54
Operations
Содержание ProLiant ML350 Gen10
Страница 26: ...SFF drive bay numbering Smart Array controller Tower orientation Rack orientation 26 Component identification ...
Страница 27: ...SFF drive bay numbering SAS expander Tower orientation Rack orientation Component identification 27 ...
Страница 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Страница 31: ...Component identification 31 ...
Страница 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Страница 55: ...10 Secure the rear end of rack rails to the rack columns with the rear shipping screws Operations 55 ...
Страница 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...