9.
Install the terminal block connector in the power supply.
10. Secure the power cord, wires, and cables in the strain relief strap attached to the power supply handle:
a. Unwrap the strain relief strap from the power supply handle.
CAUTION: Avoid tight bend radii to prevent damaging the internal wires of a power cord or a server cable.
Never bend power cords and server cables tight enough to cause a crease in the sheathing.
b. Secure the power cord, wires, and cables with the strain relief strap. Roll the extra length of the strap around the
power supply handle.
Hardware options installation
81
Содержание ProLiant ML350 Gen10
Страница 26: ...SFF drive bay numbering Smart Array controller Tower orientation Rack orientation 26 Component identification ...
Страница 27: ...SFF drive bay numbering SAS expander Tower orientation Rack orientation Component identification 27 ...
Страница 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Страница 31: ...Component identification 31 ...
Страница 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Страница 55: ...10 Secure the rear end of rack rails to the rack columns with the rear shipping screws Operations 55 ...
Страница 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...