![Hewlett Packard Enterprise ProLiant ML350 Gen10 Скачать руководство пользователя страница 121](http://html.mh-extra.com/html/hewlett-packard-enterprise/proliant-ml350-gen10/proliant-ml350-gen10_user-manual_2128084121.webp)
DIMM-processor compatibility
The installed processor determines the type of DIMM that is supported in the server:
• First-generation Intel Xeon Scalable processors support DDR4-2666 DIMMs.
• Second-generation Intel Xeon Scalable processors support DDR4-2933 DIMMs.
Mixing DIMM types is not supported. Install only the supported DDR4-2666 or DDR4-2933 DIMMs in the server.
HPE SmartMemory speed information
For more information about memory speed information, see the Hewlett Packard Enterprise website (
www.hpe.com/docs/memory-speed-table).
Installing a DIMM
Procedure
1.
2.
3.
Remove all power:
a. Disconnect each power cord from the power source.
b. Disconnect each power cord from the server.
4.
Disconnect all peripheral cables from the server.
5.
Do one of the following:
Position the tower server for hardware configuration.
• Server in rack mode:
Extend the server from the rack.
6.
7.
8.
If you are installing a DIMM for processor 2, and the fan cage is present,
9.
Open the DIMM slot latches.
10. Align the notch on the bottom edge of the DIMM with the keyed surface of the DIMM slot, and then fully press the
DIMM into the slot until the latches snap back into place.
The DIMM slots are structured to ensure proper installation. If you try to insert a DIMM but it does not fit easily into
the slot, you might have positioned it incorrectly. Reverse the orientation of the DIMM and insert it again
Hardware options installation
121
Содержание ProLiant ML350 Gen10
Страница 26: ...SFF drive bay numbering Smart Array controller Tower orientation Rack orientation 26 Component identification ...
Страница 27: ...SFF drive bay numbering SAS expander Tower orientation Rack orientation Component identification 27 ...
Страница 28: ...NVMe drive bay numbering Tower orientation Rack orientation 28 Component identification ...
Страница 31: ...Component identification 31 ...
Страница 33: ...Open the front bezel Procedure 1 Unlock the front bezel 2 Open the front bezel Operations 33 ...
Страница 55: ...10 Secure the rear end of rack rails to the rack columns with the rear shipping screws Operations 55 ...
Страница 178: ...Cable color Description Blue Front I O cable Orange Front USB cable 178 Cabling ...