GE H
EALTHCARE
D
IRECTION
5245279, R
EVISION
3
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Section 8-3 - Software Loading Procedure
8 - 103
Section 8-3
Software Loading Procedure
8-3-1
General
This describes a full system software loading (Base Software Load Image + Arirang Application Load
Image) procedure.
Use this instruction when:
- Performing the HDD with new one (Base Software Load Image + Arirang Application Load Image)
- Performing the system revision-up (Application)
8-3-2
Parts Required
LOGIQ P6 Base Software DVD
LOGIQ P6 Application Software DVD
Blank CD-Rs ( for patient image backup) or DVDs
Service Dongle
NOTE:
Patient Image Data will be deleted when all the drives are ghosted. Back up them on the CD-R
or DVD before starting software loading
NOTE:
Insert the service dongle into ths service port located at the rear panel before installing the Base
System Software Load image
8-3-3
TimeRequired
Approximately 2hours
Содержание LOGIQ P6
Страница 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Страница 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Страница 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Страница 130: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL 4 50 Section 4 9 Board Function Checks ...
Страница 477: ......