GE H
EALTHCARE
D
IRECTION
5245279, R
EVISION
3
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
8 - 20
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
20.)Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-4-4
Assembly procedure
1.) Insert two of the flexible arm stoppers (A+B) to the Power Cable and DVI cable in the Order
illustrated on the figure below. Make sure that chamfered shape of the flexible Arm stopper should
face inside. Refer to the figure below.
2.) Insert oilless bush into the flexible arm neck pipe and insert two cables into the flexible arm neck
pipe. Refer to the figure below.
Table 8-5
Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5245279, Rev 3+, Section 8-2-4. Equipment
passed all required tests and is ready for use. “
New articulation arm with cover Function
Figure 8-36 Inserting cables to the flexible arm stopper
Figure 8-37 Inserting the oilless bush
Flexible Arm Stopper
Содержание LOGIQ P6
Страница 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Страница 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Страница 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Страница 130: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL 4 50 Section 4 9 Board Function Checks ...
Страница 477: ......