GE H
EALTHCARE
D
IRECTION
5245279, R
EVISION
3
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Section 10-6 - Electrical Safety Tests
10 - 21
10-6-6-3Dale 600 Meter Procedure
5.) Set the meter's “FUNCTION” switch to LEAD TO GROUND position to measure the patient lead to
ground leakage current.
6.) Select and test each ECG lead positions (except ALL) of the LEAD selector, testing each to the
power condition combinations.
Figure 10-8 ECG Leakage Current Test
Table 10-19 Testing Power Conditions
ECG Power
Meter’s Polarity Switch
Meter’s Neutral Switch
ON
NORM
CLOSED
ON
NORM
OPEN
ON
REVERSE
CLOSED
ON
REVERSE
OPEN
OFF
NORM
CLOSED
OFF
NORM
OPEN
OFF
REVERSE
CLOSED
OFF
REVERSE
OPEN
Содержание LOGIQ P6
Страница 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Страница 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Страница 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Страница 130: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL 4 50 Section 4 9 Board Function Checks ...
Страница 477: ......