GE H
EALTHCARE
D
IRECTION
5245279, R
EVISION
3
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Section 8-7 - Mechanical Option Installation instruction
8 - 177
8-7-5
Cable Arm Hook installation
1.) This section describes the installation procedure of cable arm hook.
2.) Cable Arm Hook should be installed in prior to installing Probe Cable Hanger, or Endo Probe
Holder.
3.) Unscrew 1 existing screw from the rear side of the keyboard. Refer to the Figure 8-282.
4.) Screw 2 screws to fix the Cable Arm hook. User longer screw provide on the upper hole, and use
existing screw removed in the step 2 on the . Refer to the Figure 8-283.
Figure 8-282 Cable Arm Hook installation
Figure 8-283 Cable Arm Hook installation
Содержание LOGIQ P6
Страница 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Страница 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Страница 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Страница 130: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL 4 50 Section 4 9 Board Function Checks ...
Страница 477: ......