GE H
EALTHCARE
D
IRECTION
5245279, R
EVISION
3
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8 - 53
8-2-18
Top Cover
8-2-18-1
Tools
•
Common philips screwdrivers
8-2-18-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-18-3
Removal procedure
1.) Remove the Dummy Cover L/R. Refer to the
8-2-23 "Dummy Cover L / R" on page 8-60
2.) Remove the Top Buttom Cover. Refer to the
8-2-19 "Top Bottom Cover" on page 8-54
3.) Remove 2 rubber caps (1-2) from the top cover of the system and unscrew 2 screws (1-2). Refer to
the figure below.
4.) Unscrew 5 screws (1-5) from the bottom of the top cover.
5.) Remove the Top Cover.
6.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-18-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-93 2 rubber caps of top cover
Table 8-19 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5245279, Rev 3+, Section 8-2-18. Equipment
passed all required tests and is ready for use. “
Cover Parts Function Validation
(1)
(2)
Содержание LOGIQ P6
Страница 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Страница 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Страница 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Страница 130: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL 4 50 Section 4 9 Board Function Checks ...
Страница 477: ......