GE H
EALTHCARE
D
IRECTION
5245279, R
EVISION
3
LOGIQ™ P6/P6 P
RO
S
ERVICE
M
ANUAL
Section 8-2 - DISASSEMBLY/RE-ASSEMBLY
8 - 81
8-2-35
Rear Hook
8-2-35-1
Tools
•
Common philips screwdrivers
8-2-35-2
Preparations
•
Shut down the system and switch off the main breaker.
8-2-35-3
Removal procedure
1.) Unscrew 2 screws (1-2) and remove Rear hook.
2.) Unscrew 2 screws (1-2) and remove.
3.) Perform the following functional tests. If all are successful, include the debrief script provided below.
8-2-35-4
Mounting Procedure
Install the new parts in the reverse order of removal.
Figure 8-122 Screws on rear hook
Figure 8-123 Screws on the rear hook fix brkt
Table 8-36 Functional Tests
Service Manual
Section
Functional Test / Diagnostic Test
Debrief Script
“Service Manual, Direction
5245279, Rev 3+, Section 8-2-35. Equipment
passed all required tests and is ready for use. “
Содержание LOGIQ P6
Страница 2: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 2 ...
Страница 9: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SEVICE MANUAL vii JA ZH CN KO ...
Страница 22: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL Page 1 10 ...
Страница 130: ...GE HEALTHCARE DIRECTION 5245279 REVISION 3 LOGIQ P6 P6 PRO SERVICE MANUAL 4 50 Section 4 9 Board Function Checks ...
Страница 477: ......