GE M
EDICAL
S
YSTEMS
D
IRECTION
FK091075, R
EVISION
04
V
IVID
3N P
RO
/E
XPERT
S
ERVICE
M
ANUAL
Chapter 3 Installation
3-7
3-4-2
Damage in Transportation
Follow this procedure if damage is apparent, or if the Tilt & Drop Indicators show failure:
Table 3-5
Damage in Transportation
STEP
TASK
1
Write “Damage In Shipment” on ALL copies of the freight or express bill BEFORE delivery is accepted or
“signed for” by a GE representative or hospital receiving agent.
2
Report the damage to the carrier.
•
Whether noted or concealed, damage MUST be reported to the carrier immediately upon discovery, or in
any event, within 14 days after receipt, and the contents and containers held for inspection by the carrier.
•
A transportation company will not pay a claim for damage if an inspection is not requested within this 14
day period.
3
Report the damage on the Post Delivery Checklist.
Specify if the tilt & drop indicators show failure in the “Packing” field on the Post Delivery Checklist.
Содержание FK000040
Страница 2: ......
Страница 5: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL ii iii ...
Страница 24: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL xxii ...
Страница 597: ......