GE M
EDICAL
S
YSTEMS
D
IRECTION
FK091075, R
EVISION
04
V
IVID
3N P
RO
/E
XPERT
S
ERVICE
M
ANUAL
3-2
Section 3-2 - Installation Reminders
Section 3-2
Installation Reminders
3-2-1
Average Installation Time
Once the site has been prepared, the average installation time required is shown in
Table 3-2
below.
3-2-2
Installation Warnings
1.) Since the Vivid 3N weighs 160 kg (353 lbs) or more, without options, two persons are always
required to unpack it. This is also applicable when installing any additional items in excess of 16 kg
(35 lbs).
2.) There are no operator-serviceable components. To prevent shock, do not remove any covers or
panels. Should problems or malfunctions occur, unplug the power cord. Only qualified service
personnel should carry out servicing and troubleshooting.
3-2-2-1
System Acclimation Time
Following transport, the Vivid 3N system may be very cold, or hot. Allow time for the system to acclimate
before being switched ON. Acclimation requires 1 hour for each 2.5
o
C increment, when the temperature of
the system is below 10
o
C or above 35
o
C
.
Table 3-2
Average Installation Time
Description
Average
Installation Time
Comments
Unpacking the scanner
0.5 hour
Installing the scanner
0.5 hour
Time may vary, according to the required configuration
DICOM Option
(connectivity)
0.5 - 2.0 hours
Time may vary, according to the required configuration
CAUTION
Turning the system ON after arrival at the site - without allowing time for acclimation - may
cause system damage!
Table 3-3 Vivid 3N System Acclimation Time
°
C
60
55
50
45
40
35
30
25
20
15
10
5
0
-5
-10
-15
-20
-25
-30
-35
-40
°
F
140
131
122
113
104
96
86
77
68
59
50
41
32
23
14
5
-4
-13
-22
-31
-40
Hrs
8
6
4
2
0
0
0
0
0
0
0
2
4
6
8
10
12
14
16
18
20
Содержание FK000040
Страница 2: ......
Страница 5: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL ii iii ...
Страница 24: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL xxii ...
Страница 597: ......