GE M
EDICAL
S
YSTEMS
D
IRECTION
FK091075, R
EVISION
04
V
IVID
3N P
RO
/E
XPERT
S
ERVICE
M
ANUAL
8-102
Section 8-6 - Lower Section Components Replacement
8-6-6-5
Up/Down Handle Replacement Procedure
NOTE:
This describes the procedure for installing the new-type (metal) Up/Down Handle.
1) Insert the M6 Axis screw through the screw hole in the first handle mounting bracket, through the
two holes in the new metal Up/Down handle, then through the screw hole in the second bracket and
into M6 nut, as shown in
Figure 8-85
below.
2.) Tighten the M6 nut fully to secure the handle mounting brackets to the handle assembly.
3.) Insert the end of the gas spring cable through the slot on the gas spring cable retaining bracket and
into the grooved hole on the Up/Down handle. Slide the end of the cable into the groove, carefully
aligning the groove on the cable with that of the groove in the hole (see
Figure 8-86
below).
Tighten the securing nut against the gas spring cable retaining bracket, to hold the cable securely
in position.
Figure 8-85 Fixing the Up/Down Handle to the Handle Mounting Brackets
Up/Down Handle
M6 Axis Screw
M6 Nut
Handle Mounting Bracket
Handle Mounting Bracket
Содержание FK000040
Страница 2: ......
Страница 5: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL ii iii ...
Страница 24: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL xxii ...
Страница 597: ......