GE M
EDICAL
S
YSTEMS
D
IRECTION
FK091075, R
EVISION
04
V
IVID
3N P
RO
/E
XPERT
S
ERVICE
M
ANUAL
7-86
Section 7-4 - Performing Back End Diagnostics on the System
7-4-8
UPS Test
The UPS Test is used to verify proper operation of the uninterrupted power supply (UPS) and its
connection to the system. This procedure is performed in
Standby
Mode.
1) Hold down the ON/OFF button on the control console for more than 3 seconds.
The Shutdown Options screen is displayed, as shown in
Figure 7-57
.
2) Trackball to
Standby
and press
Select
.
The system enters Standby mode. The light on the ON/OFF button on the control console blinks
repeatedly.
3.) Disconnect the AC power cable from the mains wall power outlet.
4.) Check that the ON/OFF button on the control console blinks repeatedly (the system is now powered
by the UPS).
5.) Leave the system in this state for a period of 20 minutes, checking that the ON/OFF button
continues to blink during this time (indicating correct operation of the UPS).
6.) Reconnect the AC power cable to the mains wall power outlet.
7.) Hold down the ON/OFF button on the control console for more than 3 seconds.
The system quickly re-boots and is ready for scanning.
.
Figure 7-57 Shut-Down Options Screen
Содержание FK000040
Страница 2: ......
Страница 5: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL ii iii ...
Страница 24: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL xxii ...
Страница 597: ......