GE M
EDICAL
S
YSTEMS
D
IRECTION
FK091075, R
EVISION
04
V
IVID
3N P
RO
/E
XPERT
S
ERVICE
M
ANUAL
Chapter 10 Periodic Maintenance
10-9
10-5-2-2
Peripheral/Option Checks
If any peripherals or options are not part of the system configuration, the following checks can be omitted.
10-5-3
Input Power Checks
10-5-3-1
Mains Cable Inspection
Table 10-6 GE Approved Peripheral/Hardware Option Functional Checks
Step
Item
Description
1
VCR
Verify record/playback capabilities of the VCR. Clean heads and covers if necessary.
2
B/W Printer
Verify hardcopy output of the B/W video page printer. Clean heads and covers if necessary.
3
Color Printer
Verify hardcopy output of the Color video page printer. Clean heads and covers if necessary.
4
DICOM
Verify that DICOM is functioning properly. Send an image to a DICOM device.
5
InSite/iLinq
Verify that InSite is functioning properly. Ensure two-way remote communications.
(Warranty & Contract Customers only)
6
Footswitch
Verify that the footswitch is functioning as programed. Clean as necessary.
7
ECG
Verify basic operation with customer
Table 10-7 Mains Cable Inspection
Step
Item
Description
1
Unplug Cord
Disconnect the mains cable from the wall and system.
2
Mains Cable
Inspect the mains cable and its connectors for any damage.
3
Terminals
Verify that the LINE, NEUTRAL and GROUND wires are properly attached to the terminals,
and that no strands may cause a short circuit.
4
Inlet Connector
Verify that the Inlet connector retainer is functional.
Содержание FK000040
Страница 2: ......
Страница 5: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL ii iii ...
Страница 24: ...GE MEDICAL SYSTEMS DIRECTION FK091075 REVISION 04 VIVID 3N PRO EXPERT SERVICE MANUAL xxii ...
Страница 597: ......