Maintenance
Forms and Checklists
PlasmaQuant MS Series
214
15.3
Preventative Maintenance Checklist
Customer Name: ________________________
Address: ______________________________
Instrument Serial#: ______________________
Date: ________________________________
Preventive Maintenance Checklist
Tick (check) each box as the steps are completed.
Parts required:
10-5000-220-20
418-10-406-251
418-13-410-540
Check
Initial Performance Tests
Print out Plasma Align (Time Scan mode) and Vacuum gate valve open
and closed pages from the instrument setup.
Verify performance (sensitivity/oxides/doubly charges).
Check
Vacuum System
Drain and replace oil in rotary pump.
Clean exterior of pump.
Test vacuum interlock by attempting to start vacuum with Turbo 1
dismounted. Verify that appropriate error message is displayed.
Check
Mass Spectrometer System
Check/adjust gate valve.
Clean sampler/skimmer cones.
Clean extraction lens #1 and #2.
Detector voltage: _______
Check
Sample Introduction System
Inspect/clean torch
Inspect/replace torch gas tubing.
Inspect/adjust RF coils
Turn on the peristaltic pump (15 rpm) and nebulizer gas flow (1.0 L/min)
and aspirate de-ionized water. Check that the aerosol produced by the
nebulizer is normal and uniform.
Check/clean spray chamber and replace all O-rings.
Inspect sample introduction system electrical connections.