
PlasmaQuant MS Series
Preventative
Maintenance Overview
21
Water Cooling System
Drain water reservoir.
Clean pump strainer as needed
Clean air intake filters & heat exchange fins as needed
Inspect all water hoses for cracks/leaks.
Disassemble inline water filter & clean cartridge.
Fill water reservoir with additives and check the water conductivity according to instruction.
Inspect mains cable and plug.
Turn on and re-check water level.
Check temperature set point is 20° C and pressure
Verify operation of the water solenoid on the RF Generator module.
General Instrument
Inspect condition of argon supply hose.
Clean/replace instrument air filters
Check operation/alignment of translator table according to the service manual. Change belts.
Inspect mains power cable and plug.
Check operation of extraction system and inspect air flow sensor.
Inspect USB and serial cables/connections.
Clean all external covers.
Check argon inlet pressure (allowed range is 600-830 kPa (90-120 psi) Actual setting is
_______ kPa/psi.
Check that iCRC gas pressures are He ~150 kPa (22 psi), H2 ~100 kPa (16 psi)
Interlock Tests
Turn off argon supply and light plasma. Verify Low Argon error message is displayed.
Light plasma and press emergency stop button. Verify that plasma goes out and appropriate
error message is displayed.
Light plasma and unlatch plasma compartment/main RF door. Verify that plasma goes out
and appropriate error message is displayed.
Turn off water cooler and light plasma. Verify appropriate error message is displayed.
Accessories
Verify initialization and operation of autosampler
Check all other accessories.
Performance Tests
Update entries in Details page of Instrument Setup window as required.
Print out every section of the Instrument Setup (service mode) and put it into the log book
Tune up instrument and run performance test. Perform any corrective action necessary if
results do not meet specifications. Add performance test results to log book.
Instrument Condition
Assess and comment on condition of ICP-MS system.
Discuss condition, preventative maintenance results and instrument performance with the
customer.
Sign and date check-list after obtaining customer’s signature.