5 - 4 4
Ultron DPM series
PA
RA
LLE
L
SW
ITCH
7
Parallel
Cables
8
6
Parallel
Ports
Cable
Tray
6
Parallel
Cables
Routing
(Figure 5-39: Bottom Entry & Location of Parallel Cables,
Cable Tray and Parallel Ports)
NOTE:
1. For 1000kW UPS and 1250kW UPS, their parallel cable connection method
and routing are the same. Thus, in
Figure 5-36
,
Figure 5-37
,
Figure 5-38
and
Figure 5-39
, only the illustration of 1250kW UPS system cabinet is
taken for example.
2. In accordance with National Electrical Codes (NEC), please install a suitable
conduit and bushing for cable protection.
3. Please refer to national and local electrical codes for acceptable cable size.
4
Follow
Figure 5-40
to ground the parallel UPSs, external battery cabinet(s),
external maintenance bypass cabinets and connected critical loads.
WARNING:
%HIRUHVWDUWXSRIWKHSDUDOOHOXQLWVTXDOL¿HGVHUYLFHSHUVRQQHOPXVWVHW
each UPS’s '
Parallel Group ID
' (1 or 2) and '
Parallel ID
' (1 ~ 8) through
the LCD. Otherwise, the parallel UPSs cannot be started. Please refer to
6.2.3 Bypass Mode Start-up Procedures
and
7.9.6 Parallel Setting
.
Содержание Ultron DPM Series
Страница 12: ...1 6 Ultron DPM series 1 5 Standard Compliance UPS Capacity 1000kW 1250kW UL 1778...
Страница 38: ......
Страница 66: ......
Страница 232: ......
Страница 233: ...8 1 8 Optional Accessories 8 Optional Accessories...
Страница 235: ...9 1 9 Maintenance Maintenance 9...
Страница 243: ...10 Troubleshooting 10 1 Troubleshooting 10...
Страница 256: ......
Страница 257: ...A1 1 Appendix 1 7HFKQLFDO 6SHFL FDWLRQV Technical 6SHFL FDWLRQV A1...
Страница 260: ......
Страница 261: ...A2 1 Appendix 2 Warranty Warranty A2...
Страница 264: ......