5 - 2 5
5
Installation and Wiring
NOTE:
If you want to modify the UPS from dual input into single input, please
use the socket wrench to reinstall the three copper bars.
5.4.3 Internal Wiring between the UPS System Cabinet
and the Power Modules
1
Open
the
UPS
system
cabinet’s
two
front
doors
(
1
) and remove all internal panels (
2
).
1000/ 1250kW
Don’t
opera
te unless
in
emerg
ency!
EMER
GENCY
POW
ER O
FF
(Front View of the UPS System Cabinet with Two Front Doors Open)
Open the Two Front Doors
1
Remove the Panels
2
OUTPUT BREAKER
INPUT BREAKER
BYPASS BREAKER
BATTERY FUSE
BATTERY BREAKER
OUTPUT DRY CONTACT
INPUT DRY CONTACT
REPO
EXTERNAL BATT. TEMP. DETECTION
MANUAL BYPASS BREAKER
COM
COM
NO
NC
OD2
OD2
OD4
OD4
OD6
OD6
ID2
G2
B2
NO
NC
NC
COM
COM
NO
NC
COM
G2
G4
B4
COM
COM
NO
NC
OD1
OD1
OD3
OD3
OD5
OD5
ID1
G1
B1
NO
NO
NO
NC
NC
COM
COM
COM
G1
G3
B3
EPO
SMART SLOT
RS-232
PM
SYS
PM
SYS
PARALLEL
EXTERNAL BREAKER DETECTION
PARALLEL
SWITCH
BATT. START
REPO
OUTPUT/INPUT
DRY CONTACT
DISPLAY
EXTERNAL BATT.
TEMPERATURE DETECTION
SCR Panel
PCB Panels
Wiring Panel
(Figure 5-22: Location of the UPS System Cabinet's Internal Panels)
Содержание Ultron DPM Series
Страница 12: ...1 6 Ultron DPM series 1 5 Standard Compliance UPS Capacity 1000kW 1250kW UL 1778...
Страница 38: ......
Страница 66: ......
Страница 232: ......
Страница 233: ...8 1 8 Optional Accessories 8 Optional Accessories...
Страница 235: ...9 1 9 Maintenance Maintenance 9...
Страница 243: ...10 Troubleshooting 10 1 Troubleshooting 10...
Страница 256: ......
Страница 257: ...A1 1 Appendix 1 7HFKQLFDO 6SHFL FDWLRQV Technical 6SHFL FDWLRQV A1...
Страница 260: ......
Страница 261: ...A2 1 Appendix 2 Warranty Warranty A2...
Страница 264: ......