6 - 2 7
6
UPS Operation
UPS-1.1
Bypass
2019-Mar-01
09:30
EVENT LOG
10 mins
Bypass
Load
0 %
Mains
After the DC BUS voltage is established, the charger converter will start up and begin
to charge the batteries. Meanwhile, it will be the bypass source to supply power to the
connected loads.
UPS-1.1
2019-Mar-01
09:30
EVENT LOG
Bypass
10 mins
Bypass
Load
0 %
Mains
3
Please ensure that you are in the
Administrator
login status. For the
Administrator
password, please contact service personnel. After you are in the
Administrator
login
status, the ON/ OFF button
will appear on the
Main Screen
. Please refer to
WKH¿JXUHEHORZ
UPS-1.1
2019-Mar-01
09:30
EVENT LOG
Bypass
10 mins
Bypass
Load
0 %
Mains
ON/ OFF
Button
Administrator
Login
Содержание Ultron DPM Series
Страница 12: ...1 6 Ultron DPM series 1 5 Standard Compliance UPS Capacity 1000kW 1250kW UL 1778...
Страница 38: ......
Страница 66: ......
Страница 232: ......
Страница 233: ...8 1 8 Optional Accessories 8 Optional Accessories...
Страница 235: ...9 1 9 Maintenance Maintenance 9...
Страница 243: ...10 Troubleshooting 10 1 Troubleshooting 10...
Страница 256: ......
Страница 257: ...A1 1 Appendix 1 7HFKQLFDO 6SHFL FDWLRQV Technical 6SHFL FDWLRQV A1...
Страница 260: ......
Страница 261: ...A2 1 Appendix 2 Warranty Warranty A2...
Страница 264: ......