3
|
Components
Service manual
235
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03
CAUTION
Take care that the thermal interface grease (applied on the heat sink) does NOT
smear everything.
22
To install the switch box, see
Three phase unit
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
DANGER: RISK OF ELECTROCUTION
Confirm the rectifier voltage is below 10 V DC before proceeding, see
2
Remove the protective cover sheet.
3
Disconnect the electrical power supply wiring from the wire terminal.
4
Disconnect the Faston connectors (power supply towards hydro box) from the
wire terminal.
5
Disconnect the intermediate connectors of the power supply wiring.
6
Remove the screw and disconnect the ground wire from the switch box.
a
b
d
c
a
Electrical power supply wiring
b
Faston connectors (power supply towards hydro box)
c
Intermediate connector (power supply wiring)
d
Screw (ground wire)
7
Remove the bolt to disconnect the service port from the switch box.
8
Disconnect the indicated connectors from the main PCB.
Содержание ALTHERMA
Страница 357: ...11 11 ...
Страница 358: ......
Страница 359: ......
Страница 360: ...ESIE20 06A 2021 03 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...