3
|
Components
Service manual
181
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03
a
a
Fuse
Is the problem solved?
Action
Yes
No further actions required.
No
Return to
171] of the PCB and
continue with the next procedure.
3.14.2 Single fan outdoor unit - three phase
Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
To perform a power check of the main PCB
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
2
Turn ON the power of the unit.
3
Measure the voltage between the phases L1C‑L2C‑L3C on the main PCB.
Result:
All measurements MUST be 400 V AC ± 10%.
4
Measure the voltage connectors X801A and X802A on the main PCB.
Result:
The measured voltages MUST be 230 V AC ± 10%.
Содержание ALTHERMA
Страница 357: ...11 11 ...
Страница 358: ......
Страница 359: ......
Страница 360: ...ESIE20 06A 2021 03 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...