3
|
Components
Service manual
87
EBLA09~16DA + EDLA09~16DA
Daikin Altherma 3 M
ESIE20-06A – 2021.03
Are the measured voltages correct?
Action
Yes
Perform a position check of the 3‑way
valve (automatic procedure), see
No
Continue with the next step.
8
Measure the voltage on connector X17A pin 5 and 7.
Result:
The measured voltage MUST be 230 V AC.
Is the measured voltage on connector
X17A correct?
Action
Yes
Continue with the next step.
No
Perform a check of the hydro PCB, see
160].
9
Disconnect connector X20A from the hydro PCB.
10
Activate
DHW operation
via the user interface.
11
Measure the resistance between X20A pin 3 and 5.
Result:
The measured resistance MUST be 0 Ω.
12
De-activate
DHW operation
and activate
Space operation
via the user
interface.
13
Measure the resistance between X20A pin 1 and 5.
Result:
The measured resistance MUST be 0 Ω.
Is the resistance for both
measurements on connector X20A
correct?
Action
Yes
Relay KVR is switching correctly. Correct
the wiring between X20A, X17A and
X2M, see
No
Relay KVR is NOT switching correctly.
Replace the hydro PCB, see
164],
To perform a position check of the 3-way valve (automatic procedure)
Prerequisite:
First perform an electrical check of the 3‑way valve, see
86].
1
Turn ON the power of the unit.
2
Activate
DHW operation
via the user interface.
Содержание ALTHERMA
Страница 357: ...11 11 ...
Страница 358: ......
Страница 359: ......
Страница 360: ...ESIE20 06A 2021 03 Copyright 2021 Daikin Verantwortung für Energie und Umwelt ...