IGS-NT-BC, SW Version 1.2.0,
©ComAp – January 2019
IGS-NT-BC-1.2.0 Reference Guide.PDF
190
Description
This input is used to activate the
load reserve set #2
instead of the set #1, which
is active by default. The set #2 is adjusted by setpoints:
•
switched to absolute mode
•
and
switched to relative mode.
C
AUTION
!
All controllers cooperating together in Power management must have
the same
load reserve set selected.
N
OTE
:
It is possible to use
virtual peripheries
for distribution of the binary signal from one
physical switch connected to one controller to all other controllers over the CAN
bus.
E
XAMPLE OF USING VIRTUAL PERIPHERIES FOR SIGNAL DISTRIBUTION