7
Recommissioning the heating system
Logano plus GB312 - Technical specifications are subject to change without prior notice
53
7.18 Fitting outer casing components
V
Slot the bottom of the side panels into position first,
then raise slightly and slot in at the top.
V
Secure the side panels at the front and back of the
boiler using the securing screws.
V
Slot the bottom of the front panel into position first,
then raise slightly and slot in at the top.
V
Secure the front panel at the top of the boiler using the
securing screw.
V
Attach the clear wallet containing the technical docu-
mentation in a visible position on the boiler side panel.
Fig. 49 Fitting outer casing components
1
Side panel
2
Front panel
3
Screw
7.19 Informing the owner/operator and
handing over technical documenta-
tion
Familiarize the owner/operator with the entire heating sys-
tem and the operating instructions for the boiler.
Shut down and restart the system together with the
owner/operator.
With the aid of the operating instructions, explain to the
customer what to do in an emergency, e.g. a fire.
Hand over the technical documentation to the owner/
operator and then both sign the commissioning log
(
Æ
Section 7.20, page 54).
If the boiler side panels/front panel will not fit
properly, level the boiler (
Æ
Section 6.12.2,
page 40).
1.
2.
1.
7 747 010 720-64.1RS
Содержание Logano plus GB312
Страница 121: ...Logano plus GB312 Technical specifications are subject to change without prior notice 121 Notes ...
Страница 122: ...Logano plus GB312 Technical specifications are subject to change without prior notice 122 Notes ...
Страница 123: ...Logano plus GB312 Technical specifications are subject to change without prior notice 123 Notes ...