Installing the boiler
Logano plus GB312 - Technical specifications are subject to change without prior notice
19
4.2
Recommended wall clearances
When deciding on the installation site, the clearances for
the flue piping and the connecting pipes must be
observed (
Æ
Fig. 9 and Section 6, Connecting the flue
system and water and gas piping).
Fig. 9
Wall clearances in the boiler room
4.3
Leveling the boiler
To prevent air collecting in the boiler and to allow the con-
densate to drain freely from the condensate pan, the
boiler must be leveled.
V
Place the boiler in its final position.
V
Level the boiler horizontally by turning the adjustable
feet and using a spirit level.
Fig. 10 Leveling the boiler
1
Adjustable feet
2
Spirit level
Dimension
Wall clearance (inch)
minimum
Recom-
mended
A
20
28
B
1)
1) This clearance dimension is dependent on the flue system fitted
22
28
C
20
28
D
20
28
E
1)
6
14
Tab. 4
Recommended and minimum wall clearances
(dimensions in inches). It is imperative that the
minimum clearance (dimension E) is main-
tained.
Where applicable, allow extra wall clearanc-
es for additional components such as DHW
tank, pipe connections or other flue compo-
nents, etc.
7 747 010 720-09.1RS
A
D
B
E
C
Caution:
Risk of boiler damage due to inad-
equate load-bearing capacity of floor or un-
suitable base.
V
Make sure that the surface on which the
boiler stands has sufficient load-bearing
capacity.
V
The boiler may stand on a base made of
combustible material but not on carpet.
7 747 010 720-10.1RS
Содержание Logano plus GB312
Страница 121: ...Logano plus GB312 Technical specifications are subject to change without prior notice 121 Notes ...
Страница 122: ...Logano plus GB312 Technical specifications are subject to change without prior notice 122 Notes ...
Страница 123: ...Logano plus GB312 Technical specifications are subject to change without prior notice 123 Notes ...