3
Transporting the boiler
Logano plus GB312 - Technical specifications are subject to change without prior notice
17
3.2
Transporting the boiler on rollers
If the route to the installation site is flat, the boiler can also
be rolled. This requires at least 5 lengths of pipe approx.
28 inches long (diameter 1¼") to be placed underneath
to act as rollers.
V
Lay the lengths of pipe on the floor spaced about 16
inches apart.
V
Lift the boiler onto the lengths of pipe and carefully
transport it to the boiler room.
Fig. 8
Transporting the boiler on rollers (dimensions in
inches)
You can also use standard transport rollers.
V
So that the bottom plate is not pressed in,
it is essential to ensure that the weight is
evenly distributed across the load-bearing
parts.
7 747 010 720-08.1RS
Содержание Logano plus GB312
Страница 121: ...Logano plus GB312 Technical specifications are subject to change without prior notice 121 Notes ...
Страница 122: ...Logano plus GB312 Technical specifications are subject to change without prior notice 122 Notes ...
Страница 123: ...Logano plus GB312 Technical specifications are subject to change without prior notice 123 Notes ...