9
Heating system servicing
Logano plus GB312 - Technical specifications are subject to change without prior notice
57
9.1
Preparing the boiler for servicing
V
Shut down the heating system.
V
Unscrew the securing screw from the top centre of the
boiler front panel.
V
Lift font panel slightly and draw forwards to remove.
Fig. 51 Removing the front panel
1
Screw
9.2
General operations
The following operations are not described in any further
detail in this document. They have to be carried out nev-
ertheless:
V
Checking the general condition of the heating system.
V
Visual inspection and function check of the heating
system.
V
Checking the air supply and flue pipes for proper func-
tioning and safety.
V
Checking all gas and water piping for signs of corro-
sion.
V
Replacing any corroded pipes.
V
Checking the charge pressure of the diaphragm expan-
sion vessel.
V
Check the concentration of possibly used additives in
the water annually.
Danger:
Risk of fatal injury from electric cur-
rent.
V
Before opening up the boiler, isolate it
completely from the mains power supply
and ensure the power cannot be inadvert-
ently reconnected.
Danger:
Risk of fatal injury from the explo-
sion of flammable gases.
V
Operations on the gas pipes may only be
carried out by a properly licensed gas con-
tractor.
7 747 010 720-65.1RS
1
Содержание Logano plus GB312
Страница 121: ...Logano plus GB312 Technical specifications are subject to change without prior notice 121 Notes ...
Страница 122: ...Logano plus GB312 Technical specifications are subject to change without prior notice 122 Notes ...
Страница 123: ...Logano plus GB312 Technical specifications are subject to change without prior notice 123 Notes ...