Contents
Logano plus GB312 - Technical specifications are subject to change without prior notice
2
Contents
1
General safety instructions and explanation of
symbols 4
1.1
Safety instructions
4
1.2
Explanation of symbols
5
2
Details of the product
6
2.1
Intended use
6
2.2
Standards, regulations and directives
6
2.2.1 National regulations
6
2.3
Compliance with standards and regulations
6
2.3.1 Massachusetts installations only
7
2.4
Notes on installation and operation
8
2.4.1 Other important information
8
2.5
Heating system water quality
8
2.6
Tools, materials and equipment
8
2.7
Disposal
8
2.8
Product description
9
2.9
Package contents
11
2.10
Dimensions and specifications
12
2.10.1 Logano plus GB312 dimensions
12
2.10.2 Specifications 13
3
Transporting the boiler
15
3.1
Lifting and carrying the boiler
15
3.2
Transporting the boiler on rollers
17
4
Installing the boiler
18
4.1
Boiler room requirements
18
4.2
Recommended wall clearances
19
4.3
Leveling the boiler
19
5
Openings for combustion air supply
and venting
20
6
Installing the boiler
22
6.1
Connecting the flue pipe to the boiler
24
6.2
Installing the flue system
24
6.3
Installing the wall exit for a horizontal flue
25
6.4
Installation of the roof penetration of a vertical flue
systems
26
6.5
Connecting the air supply (for direct vent operations)26
6.6
Installing the wall exit for the air pipe
27
6.7
Installing the roof exit for the air pipe
27
6.8
Design of flue and air pipe for direct vent operation 28
6.9
Connecting the heating system
29
6.9.1 General safety instructions
29
6.9.2 Connecting the boiler to the heating system
30
6.9.3 Installing B-Kit
30
6.9.4 Connecting the central heating supply
32
6.9.5 Fitting the heating system return
32
6.9.6 Installing the DHW Tank
32
6.9.7 Installing the condensate drain
33
6.10
Filling the heating system and checking for leaks
34
6.11
Connecting the fuel supply
36
6.11.1 Installing gas feed
36
6.11.2 Installation at high altitudes
37
6.12
Electrical connections
38
6.12.1 Connecting the main power supply
38
6.12.2 Leveling the boiler
40
7
Recommissioning the heating system
41
7.1
Checking the operating pressure
42
7.2
Checking for leaks
43
7.3
Checking appliance equipment
43
7.4
Checking the air supply/ventilation and flue pipe
connection
44
7.5
Checking the air inlet diaphragm
44
7.6
Purging the gas pipe
45
7.7
Making the heating system ready for operation
45
7.8
Commissioning the control unit and burner without
programming unit RC35
45
7.9
Commissioning the control unit and burner with
programming unit RC35
45
7.9.1 Boiler intended to be used with Logamatic 4000
45
7.9.2 Boiler intended to be used with RC35
46
7.9.3 Continuing commissioning procedure with RC35
46
7.10
Switching on the boiler on the BC10
46
7.10.1 Conducting a flue gas test
47
7.10.2 Opening the Service menu and viewing monitor
data on the RC35
47
7.11
Adjusting and checking CO2 level
at maximum output
48
7.11.1 CO2 content, natural gas type A
48
7.12
Adjusting and checking CO2 level
at minimum output
48
7.12.1 CO2 content, natural gas type A (minimum output) 49
7.12.2 Reading off and comparing CO2 levels
49
7.13
Checking and monitoring CO2 level
at maximum output
49
7.14
Recording measured values
49
7.14.1 Switching the status display on the BC 10
to show the boiler temperature
50
7.14.2 Returning to operating mode from the flue gas test 50
7.14.3 Flue pressure
50
7.14.4 Carbon monoxide content
50
7.15
Function checks
51
7.15.1 Checking the (flame) ionization current
51
7.16
Measuring the gas supply dynamic pressure
52
7.17
Checking for leaks during operation
52
7.18
Fitting outer casing components
53
Содержание Logano plus GB312
Страница 121: ...Logano plus GB312 Technical specifications are subject to change without prior notice 121 Notes ...
Страница 122: ...Logano plus GB312 Technical specifications are subject to change without prior notice 122 Notes ...
Страница 123: ...Logano plus GB312 Technical specifications are subject to change without prior notice 123 Notes ...