background image

7826 213 v1.0 CA

11/2007

Safety and Installation Requirements

Please ensure that these instructions are read and understood before commencing installation. Failure to comply

with the

instructions listed below can cause

product/property damage

,

severe personal injury

, and/or

loss of life

.

Working on the equipment

The installation, adjustment, service,
and maintenance of this product must
be done by a

licensed professional

heating contractor

who is qualified and

experienced in the installation, service,
and maintenance of hot water boilers.
There are no user serviceable parts on
the boiler, burner, or control.

Ensure

main power

supply to

equipment, the heating system, and all
external controls has been

deactivated

.

Close main gas supply valve

. Take

precautions in both instances to avoid
accidental activation of power during
service work.

Ensure that the installation
literature of other applicable
components is referenced.

Removing Front Enclosure Panel

1.

Remove the screw at the top of
boiler

.

2.

Press down on springs at bottom
of boiler

and remove the front

enclosure panel

.

3.

Drain heating water from boiler.

4.

Flip control console down

.

P

le

a

s

e

fi

le

in

S

e

r

v

ic

e

B

in

d

e

r

Installation Instructions

for use by heating contractor

Heating Return Connection Pipe,

Part No. 7826 213

for Vitodens 100-W, WB1A boilers

D

A

C

B

Содержание Vitodens 100 WB1A

Страница 1: ...er serviceable parts on the boiler burner or control Ensure main power supply to equipment the heating system and all external controls has been deactivated Close main gas supply valve Take precautions in both instances to avoid accidental activation of power during service work Ensure that the installation literature of other applicable components is referenced Removing Front Enclosure Panel 1 Re...

Страница 2: ... 3 Loosen the fitting on the gas connection pipe 4 Loosen four screws remove burner and disconnect all electrical cables from blower motor 7826 213 v1 0 CA F C E B A D To avoid damage to the burner do not lay burner on its cylindrical burner tube Failure to heed this caution may cause damage to the burner tube which may lead to improper operation CAUTION ...

Страница 3: ...n connector from the heat exchanger 7 Attach new plug in connector to heat exchanger using screw 8 Reassemble the boiler in reverse order Pay extra attention to correct installation of gasket G onto the heat exchanger when reinstalling the vent pipe adaptor 9 Fill the boiler with water flush and check for leaks Vitodens 100 Installation and Service Instructions Use new gaskets and pipe sealing com...

Страница 4: ...ann Manufacturing Company U S Inc 45 Access Road Warwick Rhode Island 02886 USA 1 800 288 0667 Fax 401 732 0590 www viessmann us com info viessmann us com 4 Printed on environmentally friendly recycled and recyclable paper 7826 213 v1 0 CA Technical information subject to change without notice Printed on environmentally friendly recycled and recyclable paper ...

Отзывы: