Tab.25 Charging the refrigerant fluid
Length of refrigeration pipe
AWHP 6 MR-3
AWHP 8 MR-2
AWHP 11 MR-2
AWHP 16 MR-2
AWHP 11 TR-2
AWHP 16 TR-2
11 to 20 m
+ 0.2 kg
+ 0.15 kg
+ 0.2 kg
21 to 30 m
+ 0.4 kg
+ 0.3 kg
+ 0.4 kg
31 to 40 m
+ 0.6 kg
+ 0.9 kg
+ 1 kg
41 to 50 m
not permitted
not permitted
+ 1.6 kg
51 to 60 m
not permitted
not permitted
+ 2.2 kg
61 to 75 m
not permitted
not permitted
+ 2.8 kg
6.6.5
Test the leak-tightness
1. Open the plugs in the A and B / C stop valves.
2. Check that A and B / C stop valves are closed.
3. Remove the plug from the service connection on A stop valve.
4. Connect the pressure gauge and the nitrogen bottle to the stop valve
A then progressively build up the pressure in the refrigerant
connection pipes and the indoor module to 35 bar, in 5 bar
increments.
5. Check the leak-tightness of the fittings using a leak detector spray. If
leaks appear, repeat the steps in order and check the leak-tightness
once again.
6. Release the pressure and release the nitrogen.
Fig.43
MW-M002297-2
A
B
C
35 bar
1
1
1
2
2
2
5
3
4
6 Installation
44
AWHP-2 PBS-i
7706696 - v04 - 11102018
Содержание PBS-i WH2 Series
Страница 45: ...12 Appendix 7706698 v04 17102018 AWHP 2 PBS i 45 ...
Страница 46: ...12 Appendix 46 AWHP 2 PBS i 7706698 v04 17102018 ...
Страница 69: ...3 4 Electrical diagram Fig 12 MW 5000747 5 3 Technical specifications 7706696 v04 11102018 AWHP 2 PBS i 21 ...
Страница 154: ...12 Decommissioning and disposal 106 AWHP 2 PBS i 7706696 v04 11102018 ...
Страница 178: ...1 Spare parts 22 AWHP 2 PBS i 7706697 v04 11102018 ...