7.3
Commissioning procedure
Caution
Initial commissioning must be performed by a qualified
professional.
1. Refit all the panels, fascias and covers on the indoor module and
outdoor unit.
2. Arm the indoor module and outdoor unit circuit breakers on the
electric panel by setting them to the I position.
3. If necessary, arm the electrical back-up circuit breaker on the
distribution board by setting it to the I position.
The heat pump is switched on. When powering up for the first time,
the control panel displays the CNF menu which enables the type of
outdoor unit present in the installation to be set.
4. Set the CN1 and CN2 parameters according to the table below.
5. The heat pump begins the start-up cycle.
7.3.1
CNF Menu
The CNF menu is used to configure the hybrid heat pump according to the
type of back-up and the output of the outdoor unit installed.
Tab.41 Value of the CN1 and CN2 parameters with a hydraulic back-up
Output of the outdoor unit
CN1
CN2
4.5 kW
18
1
6 kW
2
1
8 kW
3
1
11 kW
4
1
16 kW
5
1
Tab.42 Value of the CN1 and CN2 parameters with an electrical back-
up
Output of the outdoor unit
CN1
CN2
4.5 kW
17
1
6 kW
7
1
8 kW
8
1
11 kW
9
1
16 kW
10
1
7.3.2
Start-up cycle
During the start-up cycle, the display shows various brief items of
information for checking.
These items of information are displayed one after the other.
1. Display of the control panel version
2. SCAN to search for the various options connected
Fig.62
MW
-5
0
0
0
0
2
9
-3
Fig.63
MW
-5
0
0
0
0
5
5
-3
7 Commissioning
7706696 - v04 - 11102018
AWHP-2 PBS-i
59
Содержание PBS-i WH2 Series
Страница 45: ...12 Appendix 7706698 v04 17102018 AWHP 2 PBS i 45 ...
Страница 46: ...12 Appendix 46 AWHP 2 PBS i 7706698 v04 17102018 ...
Страница 69: ...3 4 Electrical diagram Fig 12 MW 5000747 5 3 Technical specifications 7706696 v04 11102018 AWHP 2 PBS i 21 ...
Страница 154: ...12 Decommissioning and disposal 106 AWHP 2 PBS i 7706696 v04 11102018 ...
Страница 178: ...1 Spare parts 22 AWHP 2 PBS i 7706697 v04 11102018 ...