
9.4.3
COUNTERS, TIME PROG, CLOCK \CLK menus
Tab.69
CLK parameter
Unit
HMI
HOURS
Can be set from 0 to 23
available
MINUTE
Can be set from 0 to 59
available
DATE
Can be set from 1 to 31
available
MONTH
Can be set from 1 to 12
available
YEAR
Can be set from 2000 to 2100
available
9.5
Description of the parameters
9.5.1
Running the back-up in heating mode
Start-up conditions for the back-up
Important
If the AP001 and AP100 parameters are configured to 4, 6 or 8
and the corresponding BL input is active, the back-ups will be
deactivated and will only start up for safety reasons and to
enable defrosting.
If the HP030 and HP031 parameters are set to 0, the activation
and deactivation time delays on the back-up are set according
to the outside temperature.
In heating mode, the back-up is managed by the following parameters:
Tab.70 Parameter for heating production
Parameter
Description
AP016
Activate or deactivate processing of the heating demand for central heating
HP030
Start-up time delay for the next back-up generator in central heating mode (t1).
HP031
Shutdown time delay for the next generator in central heating mode (t2).
AP001
Selection of the BL blocking function when a signal is applied at the input (BL1).
AP100
BL2 input function configuration.
The time delay curve for tripping the back-up is defined by the HP047,
HP048, HP049 and HP050 parameters.
1 HP047: Minimum duration of the time delay for tripping the back-up
2 HP048: Maximum duration of the time delay for tripping the back-
up
3 HP049: Minimum outside temperature for the time delay for
tripping the back-up
4 HP050: Maximum outside temperature for the time delay for
tripping the back-up
T Time (minutes)
t Outdoor temperature (°C)
Back-up operation if an error occurs on the outdoor unit
If an error occurs on the outdoor unit during a system heating demand, the
boiler or electrical back-up starts up immediately to guarantee heating
comfort.
Back-up operation if defrosting the outdoor unit
When the outdoor unit is undergoing defrosting, the control unit ensures
full protection of the system by starting up the back-ups if necessary.
Fig.110
MW-6000377-2
0
-10
-20
20
10
15°
10’
20’
30’
T
t
2
4
3
1
9 Settings
7706696 - v04 - 11102018
AWHP-2 PBS-i
87
Содержание PBS-i WH2 Series
Страница 45: ...12 Appendix 7706698 v04 17102018 AWHP 2 PBS i 45 ...
Страница 46: ...12 Appendix 46 AWHP 2 PBS i 7706698 v04 17102018 ...
Страница 69: ...3 4 Electrical diagram Fig 12 MW 5000747 5 3 Technical specifications 7706696 v04 11102018 AWHP 2 PBS i 21 ...
Страница 154: ...12 Decommissioning and disposal 106 AWHP 2 PBS i 7706696 v04 11102018 ...
Страница 178: ...1 Spare parts 22 AWHP 2 PBS i 7706697 v04 11102018 ...