
2. Pass the outlet pipe from the safety valve through the opening
provided for this purpose.
3. Connect the outlet pipe to the waste water discharge.
Caution
The discharge pipe in the safety valve or unit must not be blocked.
6.6
Refrigeration connections
6.6.1
Preparing the refrigerant connections
Danger
Only a qualified professional may carry out the installation in
conformity with current legislation and standards.
To allow exchanges between the indoor module and the outdoor unit, fit 2
refrigerant connections: flow and return.
Pursuant to European Regulation 517/2014, the installation of equipment
must be done by a certified operator whenever the refrigerant load is in
excess of two kilograms or when a refrigerant connection is necessary (the
case with split systems, even when fitted with a quick coupling device).
1. Install the refrigerant connection pipes between the indoor module
and the outdoor unit.
2. Respect the minimum curve radii of 100 to 150 mm.
3. Adhere to the minimum and maximum distances between the indoor
module and the outdoor unit.
4. Cut the pipes with a pipe cutter and deburr.
5. Angle the opening in the pipe downwards to ensure no particles can
get inside, while preventing oil traps.
6. If the pipes are not connected immediately, plug them to prevent
moisture from entering.
Fig.37
Orifice
MW-3000540-02
2
6 Installation
7706696 - v04 - 11102018
AWHP-2 PBS-i
41
Содержание PBS-i WH2 Series
Страница 45: ...12 Appendix 7706698 v04 17102018 AWHP 2 PBS i 45 ...
Страница 46: ...12 Appendix 46 AWHP 2 PBS i 7706698 v04 17102018 ...
Страница 69: ...3 4 Electrical diagram Fig 12 MW 5000747 5 3 Technical specifications 7706696 v04 11102018 AWHP 2 PBS i 21 ...
Страница 154: ...12 Decommissioning and disposal 106 AWHP 2 PBS i 7706696 v04 11102018 ...
Страница 178: ...1 Spare parts 22 AWHP 2 PBS i 7706697 v04 11102018 ...