Avaya Communication Manager controlled maintenance
AN-LN-PT (Analog Line Port)
Maintenance of the Avaya G350 Media Gateway
81
June 2004
1392
ABORT
This port is currently a TTI port and the test does not execute on it.
Verify that the port is a TTI port:
Enter the
display port GGGVSpp
command (the display shows that the
port is a TTI port).
Enter the
list configuration
command (the display shows a
t
for the
port).
If both commands indicate that the port is a TTI port, the abort is correct
for the test, and no action is necessary.
If either command indicates that the port is not a TTI port, escalate the
problem.
2000
ABORT
Response to the test request was not received within the allowable time
period.
2100
ABORT
System resources required to run this test are not available.
Retry the command at 1-minute intervals no more than 5 times.
If the test continues to abort, escalate the problem.
Table 37: TEST #35 Battery Feed Test 2 of 3
Error
Code
Test
Result
Description/Recommendation
2 of 3
Содержание Media Gateway G350
Страница 1: ...Maintenance of the Avaya G350 Media Gateway 555 245 105 Issue 3 June 2004 ...
Страница 16: ...About this book Sending us comments 16 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 48: ...G350 component maintenance IP telephones 48 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 284: ...Monitoring Extended keepalive 284 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 306: ...G350 traps G350 traps and resolutions 306 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 326: ...Media Server alarms S8300 alarms UPS 326 Maintenance of the Avaya G350 Media Gateway June 2004 ...