Avaya Communication Manager controlled maintenance
DIG-LINE (Digital Line)
Maintenance of the Avaya G350 Media Gateway
125
June 2004
Digital Line Electronic Power Feed Test(#11)
MM711 boards provide power to the terminals. Therefore this will be an EPF restore test. The test
procedure and its response is same as that of EPF. If the over current persists the power will be shut off
automatically and an EPF_off_overcurrent message is sent uplink.
Table 66: TEST#11 Digital Line Electronic Power Feed Test 1 of 2
Error
Code
Test
Result
Description/ Recommendation
ABORT
Internal system error
Retry the command at 1-minute intervals a maximum of 5 times.
1000
ABORT
System resources required to run this test are not available. The port may be
busy with a valid call.
Enter
display port GGGVSpp
to determine the station extension or
attendant number of the port. Use
status station
or
status attendant
to
determine the service state of the port. If the port is in use, wait until the
port is idle before testing. Attendants are always in use (off-hook) if the
handset is plugged in and the port is not busied out.
If the port status is idle, then retry the command at 1-minute intervals a
maximum of 5 times.
1 of 2
Содержание Media Gateway G350
Страница 1: ...Maintenance of the Avaya G350 Media Gateway 555 245 105 Issue 3 June 2004 ...
Страница 16: ...About this book Sending us comments 16 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 48: ...G350 component maintenance IP telephones 48 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 284: ...Monitoring Extended keepalive 284 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 306: ...G350 traps G350 traps and resolutions 306 Maintenance of the Avaya G350 Media Gateway June 2004 ...
Страница 326: ...Media Server alarms S8300 alarms UPS 326 Maintenance of the Avaya G350 Media Gateway June 2004 ...